1. 计划停机
Shut Down (Normal)
2. 模具维修
Tooling Repairing
3. 设备维修
Equipment Repairing
4. 待料停机
Shut Down (Awaiting Material)
5. 注塑部待入库区
Awaiting Stored Area of Molding
6. 注塑部信息栏
Notice Board of Molding
7. 注塑部模具明细表
Tooling List of Molding (一层:Top; 二层:Middle; 三层:Bottom)
8. 模具存放区
Tooling Deposit
9. 注塑巡模保养记录表
Tooling Maintenance Track Record
10. 注塑成型参数记录表
Molding Process Parameter
11. 工程试模
Project Dept. Trial Run
12. 注塑产品生产情况跟进表
Producing Track Record of Molding
13. 检验区
Inspecting
14. 待验区
Inspecting to-be
15. 合格区
Qualified
16. 注塑部物料区
Material for Molding
17. 工程试模待领走产品
Trial-run Products Claim
18. 浇口料暂存区
De-gate Storing Area